GMG ships first G CELLS fast-charge pouch cells for customer testing

Graphene Manufacturing Group (GMG) has begun sending its G CELLS fast-charging pouch cells to potential customers for early-stage testing. The first batch has been sent out, and the company expects to supply more than 100 cells by the end of 2026. The initial target sectors include defense and heavy mobile equipment.

The pouch cells are about 1.5 Ah and designed to charge in six minutes. GMG developed and supplied the battery materials from its Brisbane Battery Development Centre, and the Battery Innovation Center of Indiana (BIC Indiana) assembled the cells. The recipients will test fast-charge capability, cycle life and energy efficiency in their own conditions and give feedback to guide development, optimization and scale-up.

 

GMG recently reported test data from BIC Indiana: cells charged and discharged in six minutes (7C) with no performance reduction after 1,000 cycles. At a six-minute charge (10C), the energy density reached 58 Wh/kg, up 48% from the previously reported 39 Wh/kg. Energy efficiency at high rates was 94%, compared with 64% for a lithium titanate oxide cell tested in the same way. The company noted that these are lab results and customer testing may differ.

The samples are pre-commercial and not for use in commercial products. The technology, which is being developed under a joint development agreement with Rio Tinto, remains at battery technology readiness level 4, meaning it has been validated in a laboratory. GMG hopes to reach levels 7 and 8 but gives no timeline. CEO Craig Nicol called it “early testing”, but said it is the right time to get real-world feedback. The company will collect data over the coming months while working on energy density, 10C cycle life and larger cell formats.

GMG moved its aluminum-ion work to pouch cells in 2023, after the Rio Tinto agreement.

Source: 
Posted: Oct 21,2026 by Roni Peleg

Comments